Sunshine room construction process steps
Editor: liefan, December 15, 2019 11:00:28

What are the construction process steps of sunshine room

In addition to the good and bad data, the construction technology is his second vitality. As long as skilled craftsman can create a safe and strong, beautiful atmosphere of sunshine room.

  

Frame: the mesh structure must be evenly distributed. The size of each file is moderate, and the length and width of each file are about 1m. If it is too small, it is too small. If it is too large, the glass at the top can bear a lot of load. When welding the frame, the upper and lower parts must be fully welded, not to mention spot welding, but also to have false welding, which is the most important thing for the whole frame. Fluorocarbon primer and topcoat should be used in the sunlight room of steel structure, and spraying must be adopted and the surface should be average to achieve the maximum anti rust result.

Capping: first use double-sided foam tape to position each glass, consider the elements of building height and wind pressure, seal the frame and glass with special structural adhesive for curtain wall, and then fix them with aluminum pressure strip (the goal is that even if the glass is broken in case of natural disasters, the glass will be broken and then lost in the future, which can reduce the risk of him). The top glass and glass are sealed with special structural adhesive for curtain wall and covered with small glass strips to achieve the maximum waterproof limit.

1、 Comprehensive description of sunshine room construction process

The project is the nursery shed sunlight house project of China Academy of atomic energy. The construction scope of the project includes the steel (aluminum alloy) frame structure, glass production and field installation construction.

2、 Construction preparation

1. Organize relevant project management and technical personnel to review the design drawings. If the drawings are not clear and there are difficulties in the construction, the change verification procedures shall be completed with the design unit.

2. According to the decoration effect drawing of sunshine room, combined with the equipment and technical conditions of the unit, formulate the main construction scheme of the project, and put forward the material plan.

3. Check the performance of machinery and testing equipment used in steel (aluminum alloy) structural engineering to ensure that all kinds of equipment are in good working condition and have complete functions during construction.

4. The materials used in steel (aluminum alloy) steel structure engineering should have quality certificate and material inspection report before use.

The safety and safety of construction personnel shall be trained before the construction of aluminum alloy.

6. When the steel (aluminum alloy) structure enters the site, it is necessary to inspect the components and stack them reasonably, so as to facilitate the smooth installation of the components after entering the site.

3、 Labor plan for construction process of leisure sunshine house

Labor force construction plan of aluminum alloy structure

The number of labor force input in the construction stage of the project

Installation stage

6 welders

6 workers

2 electricians

4、 Main construction machinery and equipment of sunshine room construction process

Main construction machinery and equipment of steel (aluminum alloy) structural engineering

No. name and quantity of machines and tools

1 manual cutting machine 2 sets

2 manual angle grinder 6 sets

4 manual electric welding machine 3 sets

5 electric hand drills 8 sets